Brown's Field Community Centre boiler and BMS replacement

CCambridge City Council logo
Contracting authorityCambridge City Council
ActiveWorksCPV 45331000
Submission deadline8 Jan 202712:001 month left
Published26 Nov 2026
LocationCambridge, UKH12, United Kingdom
Executive Compass

TenderTracker partner offer · 10% off

Get help writing this bid

Executive Compass has an 85%+ bid success rate across the bids it supports. TenderTracker users receive 10% off eligible services.

Success rate: Executive Compass
Explore bid writing support

Description

The Brown's Field Community Centre has a TREND IQ246 BMS, gas boiler for heating, gas boiler for heating and extract ventilation systems that all need to be assessed and repaired/replaced.

1. BMS replacement will be based on an Trend IQ5x controller and retain the majority of controls equipment already installed on site, upgrading what is required to ensure the system can operate as required. All components of the system will be commissioned at the end of the project and demonstrated as commissioned to a Cambridge City Council representative. The existing IQ246 will be returned to Cambridge City Council.

2. Provide a panel-mounted touchscreen display (HMI) IQVIEWx-SCD for the Trend BMS to enable local plant room monitoring and control of the BMS.

3. The existing gas boiler and associated equipment not necessary to complete the project will be decommissioned and removed from site. An appropriate ASHP for connection to the existing four under floor heating manifolds will be installed and have the capability to provide cooling in a future project. All components of the system will be commissioned at the end of the project and demonstrated as commissioned to a Cambridge City Council representative. The under-floor heating will be controlled by the new Trend BMS system.

4. The existing domestic hot water boiler and associated equipment not necessary to complete the project will be decommissioned and removed from site. Instantaneous water heaters (and dedicated electrical circuit) will be supplied to 10 rooms and domestic hot water flow and return pipework will as far as reasonably practicable be removed from the building.

5. Extract ventilation will be tested, repaired where possible, and where they cannot be repaired extract fans will be replaced with equivalent duty extract fan units that are capable of BMS integration.

6. THERMAL STORAGE CYLINDER OPTION: The additional option of a thermal storage cylinder should be proposed to allow generation of heating during off peak hours for use during the day.

7. DESIGN INFORMATION: Brown's Field Community Centre plantroom is approximately 10m away from the site boundary with residential neighbours just beyond. The ASHP system chosen will need to satisfy all noise restrictions both at commissioning and for the units' serviceable life of up to 20 years (assuming annual servicing and repairs completed).

The rest of this notice

The tender documents, the buyer's named contact and the award history for this notice are free. Create an account to open the full record.

  • Download the tender documents
  • Contact the buyer directly
  • See who won, and for how much
  • Get alerts for tenders like this one
Create a free account

Free — no card, no trial clock.

Get new Heating, ventilation and air-conditioning installation work contracts by email — free, no card needed.
Create a free alert

Guides for bidders

New to public sector tendering? These short guides explain how the process works.