Back to search
Find a TenderRef 105209-2026

GMCA 2171 Strategic Environmental Assessment

GGreater Manchester Combined Authority logo
Contracting authorityGreater Manchester Combined Authority
PlanningServicesCPV 90711400
Contract value£100,000
Published5 Nov 2026
LocationManchester, UKD33, United Kingdom

Description

Strategic Environmental Assessment (SEA) - Greater Manchester Joint Minerals and Waste Plan

The Greater Manchester Combined Authority is undertaking an expression of interest for the following:

Strategic Environmental Assessment (SEA) to support the forthcoming Greater Manchester Joint Minerals and Waste Plan (GMJMWP).

The 10 Greater Manchester authorities (Bolton, Bury, Manchester, Oldham, Rochdale, Salford, Stockport, Tameside, Trafford and Wigan) are working together to produce the Greater Manchester Joint Minerals and Waste Plan. This will be a single plan to replace the existing Minerals Plan and Waste Plan, which were adopted in 2013 and 2012 respectively. The plan will be developed working in partnership with local authorities and a specialist third-party and will be produced in line with the Town and Country Planning (Local Planning)(England) Regulations 2026 under the new plan-making system. The SEA will be required as part of this work, to identify any environmental effects as a result of implementing the plan, and any reasonable alternatives. The timetable for the GMJMWP is to be agreed but, under transitional arrangements set out in the 2026 Regulations, the 10 authorities are required to give notice of commencement of plan making before 31st December 2026 and to pass through Gateway 1 by 30th April 2027.

The proposed commission comprises the following activities:

- Strategic Environmental Assessment for Greater Manchester Joint Minerals and Waste Plan

- Preparation and consultation on the scope and level of detail of the SEA Environmental Report. This will run at the same time as the consultation on the proposed minerals and waste plan content and evidence.

- Preparation and consultation on the proposed SEA Environmental Report. This will run at the same time as the as consultation on the proposed minerals and waste plan.

- Review and finalise SEA Environmental Report prior to ‘Gateway 3’.

The rest of this notice

The tender documents, the buyer's named contact and the award history for this notice are free. Create an account to open the full record.

  • Download the tender documents
  • Contact the buyer directly
  • See who won, and for how much
  • Get alerts for tenders like this one
Create a free account

Free — no card, no trial clock.

Get new Environmental Impact Assessment (EIA) services other than for construction contracts by email — free, no card needed.
Create a free alert

Guides for bidders

New to public sector tendering? These short guides explain how the process works.