LCRCA Consultancy Agreement - Water & Filtration
Description
The purpose of this commission is for the Contractor to undertake a feasibility study and cost analysis including anticipated return on investment providing a detailed report focusing on:
• The reuse of tunnel sump water for tunnel wall washing.
• The reuse of building roof and waste water for flushing building toilets and use in sinks and showers.
The Contractor shall undertake the feasibility study following RIBA stages:
• RIBA stage 0 - Strategic Definition.
• RIBA stage 1 - Preparation and Briefing.
• RIBA stage 2 - Concept Design.
The feasibility study shall consider the reuse and filtration of sump water to current safe water quality standards considering the production requirements of the tunnel washing operations
The rest of this notice
The tender documents, the buyer's named contact and the award history for this notice are free. Create an account to open the full record.
- Download the tender documents
- Contact the buyer directly
- See who won, and for how much
- Get alerts for tenders like this one
Free — no card, no trial clock.
Guides for bidders
New to public sector tendering? These short guides explain how the process works.