ISO11 Fumigation Lobby and Dedicated Air Handling Unit (AHU)
Description
This opportunity (“Contract”) is for a single supplier to provide:
1. Design, Build, Installation and Operational Qualification of a new Fumigation Lobby and dedicated AHU for the ISO11 SAPO 4 Animal Facility.
2. Detailed Design including attendance to HAZOP study and allowance for updating Detailed Design in line with HAZOP Recommendations.
3. Build of the new Fumigation Lobby and Dedicated AHU at the supplier’s factory which includes Factory Acceptance Test (FAT).
4. Delivery of new Fumigation Lobby and Dedicated AHU to The Pirbright Institute.
5. Installation of new Fumigation Lobby and Dedicated AHU into refurbish area of ISO11. (Please note that the area where the new equipment will be installed will be externalised from ISO11 and refurbished by others, who will also provide a CDM Construction Site for all works to take place. They will act as Principal Designer and Principal Contractor).
6. SAT of installed Fumigation Lobby and Dedicated AHU whilst in the externalised area.
7. SAT of installed Fumigation Lobby and Dedicated AHU once it has been internalised back into ISO11 SAPO 4 Animal Facility. This will be the Operational Qualification.
8. Management of all subcontractors employed by the supplier to complete these works.
9. On completion, an O&M is to be submitted which provides details of works from design to completion.
The rest of this notice
The tender documents, the buyer's named contact, the award history and our AI analysis for this notice are part of Pro. Start a free trial to open the full record.
- Download the tender documents
- Contact the buyer directly
- See who won, and for how much
- Read the AI analysis of scope and risk
- Get alerts for tenders like this one
14 days free. No card required.
Guides for bidders
New to public sector tendering? These short guides explain how the process works.