Design and Construction of a Solar Farm and Battery Energy Storage System (BESS) at Docks Way Landfill Site

CCyson Cymru logo
Contracting authorityCyson Cymru
ClosedWorksCPV 45000000
Contract value£2,700,000
Submission deadline17 Aug 202612:00Closed
Published21 Jul 2026
LocationNewport, UKL21, United Kingdom

Description

Cyson Cymru, on behalf of Newport City Council (NCC), is seeking Engineering, Procurement and Construction (EPC) proposals for the turnkey design, installation, and commissioning of the solar farm and a DC coupled battery with a 400V grid connection at the Newport City Council’s recycling centre depot in Newport, to form a fully compliant and working installation.

It is anticipated that the EPC contract will be awarded in 2026, and the design and construction will be undertaken in 2026/7.

The Contractor will be responsible for the supply, installation, and maintenance of a solar photovoltaic and battery system (the ‘Works’) up to 1.1MWp in gross PV capacity with a 2MWh DC battery energy storage system (BESS) on the land shown in Appendix 19.3 of the Specification, and located at grid reference ST306857.

ITT Reference: ITT_126083

Please note that a pre market engagement notice was previously published in relation to this tender. MAR594663

The rest of this notice

The tender documents, the buyer's named contact and the award history for this notice are free. Create an account to open the full record.

  • Download the tender documents
  • Contact the buyer directly
  • See who won, and for how much
  • Get alerts for tenders like this one
Create a free account

Free — no card, no trial clock.

Get new Construction work contracts by email — free, no card needed.
Create a free alert

Guides for bidders

New to public sector tendering? These short guides explain how the process works.