Isotope Adjustment System- Thermal Cycling Absorption Process
Description
UKFE is looking to develop the ability of TCAP within a Fuel Cycle to adjust the isotopic composition of tritium, deuterium and separate protium of continuous mixed isotopic feed within the STEP Fuel Cycle to ensure the delivery of STEP within the 2040s. To support this goal, the fuel cycle will perform a closed loop process: it will inject fuel into the plasma, capture the unspent fuel from the exhaust, purify it, separate and re-inject it within the plasma, ensuring efficient tritium recycling. There are multiple gas separations to be performed within the fuel cycle system, for which testing is required in some areas to support the appropriate selection and design of separation technologies.
For more information about this opportunity, please visit the eSourcing portal at:
To respond to this opportunity, please click here:
The rest of this notice
The tender documents, the buyer's named contact, the award history and our AI analysis for this notice are part of Pro. Start a free trial to open the full record.
- Download the tender documents
- Contact the buyer directly
- See who won, and for how much
- Read the AI analysis of scope and risk
- Get alerts for tenders like this one
14 days free. No card required.
Guides for bidders
New to public sector tendering? These short guides explain how the process works.