Back to search
Find a TenderRef 022187-2026

ROOT to Market Dynamic Market for Regenerative Procurement

HHEART ACADEMIES TRUST logo
Contracting authorityHEART ACADEMIES TRUST
ActiveGoodsCPV 09000000
Submission deadline31 Mar 203623:59116 months left
Published12 Mar 2026
LocationBedford, UKH24, United Kingdom

Description

Regeneration Over Extraction. Suppliers must seek to:

 Prioritise materials and products that restore, replenish, or enhance natural living systems.

 Avoid extractive materials that degrade ecosystems, deplete finite resources, or cause long term environmental harm.

 Use resource efficiently and maximise material lifespans through good design and appropriate material use

 Demonstrate a clear transition plan away from extractive inputs where alternatives are not yet available.

 Minimise embodied carbon in construction materials (e.g., concrete, steel, insulation).

 Prioritise regenerative or circular construction materials (e.g., reclaimed steel, recycled aggregates, lower embodied carbon concrete alternatives, timber from regenerative forestry).

 Avoid extractive materials linked to high impact mining (e.g., virgin aggregates, aluminium, PVC).

 Seek to design for deconstruction, enhancing the residual value of materials at the end of design life and reducing future reliance on extractive practices

Ethical and Non-Exploitative Supply Chains. Suppliers must seek to:

 Ensure all labour practices across their supply chain are fair, safe, and free from exploitation.

 Avoid sourcing from suppliers or regions associated with forced labour, unsafe working conditions, or unfair pay.

 Maintain transparent supply chain mapping and provide evidence of due diligence on request.

 Ensure fair and safe working conditions on construction sites.

2.3 Climate Friendly Operations. Suppliers must seek to:

 Minimise carbon, water and waste in their organisations and core operations.

 Specifically minimise greenhouse gas emissions across production, transport, and distribution.

 Prioritise low carbon materials, renewable energy, and efficient logistics.

 Minimise whole life carbon impacts in design and materials, optimising embodied carbon together with operational efficiency.

 Reduce site emissions (plant, generators, transport) and use electric or low emission plant and machinery.

 Implement site level water management and waste segregation plans.

 Demonstrate continuous improvement in reducing their carbon footprint, water usage and waste production, supported by measurable data where possible.

 Drive design towards deconstruction practices and offer (and advocate for) regenerative material options to replace more mainstream materials

Nature Enhancing Practices. Suppliers must seek to:

 Adopt practices that actively improve soil health, biodiversity, water quality, and ecosystem resilience.

 Use regenerative agricultural, manufacturing, or operational methods wherever feasible.

 Avoid chemicals, processes, or materials known to harm biodiversity or natural habitats.

 Implement nature positive site practices.

 Ensure soil protection and restoration before and after works.

 Avoid habitat disturbance and protect ecological features during construction.

Circularity and Resource Stewardship. Suppliers must seek to:

 Maximise recycled, reclaimed, or up-cycled materials.

 Design products and packaging for reuse, repair, or recycling.

 Minimise waste generation and avoid single use materials unless essential for safety or compliance.

 Design for reuse, modularity and disassembly.

 Maximise reuse of demolition materials.

 Avoid single use construction materials (e.g. plastic sheeting)

 Offer and opt for the use of bio-based and recovered materials wherever viably possible

The rest of this notice

The tender documents, the buyer's named contact and the award history for this notice are free. Create an account to open the full record.

  • Download the tender documents
  • Contact the buyer directly
  • See who won, and for how much
  • Get alerts for tenders like this one
Create a free account

Free — no card, no trial clock.

Guides for bidders

New to public sector tendering? These short guides explain how the process works.