Design and Build Works for Mains Sewer Connection at High Lodge
Description
The works comprise the detailed design, construction, testing and commissioning of a new foul sewer system to replace the existing on site sewage treatment arrangements at High Lodge.
The works include the provision of an approximately 2,037 m foul sewer system, comprising:
• Rising/pumping main
• gravity sewer main
• pumping station
• holding tank
• a connection to the existing Anglian Water foul sewer network.
The works are provided along the pre determined route identified by Forestry England.
The rest of this notice
The tender documents, the buyer's named contact and the award history for this notice are free. Create an account to open the full record.
- Download the tender documents
- Contact the buyer directly
- See who won, and for how much
- Get alerts for tenders like this one
Free — no card, no trial clock.
Guides for bidders
New to public sector tendering? These short guides explain how the process works.