Major Maintenance Works to Harrington Bridge - Phase 2
Description
Replacement of existing severely corroded cross bracing sections at the pier, paint the caissons and connection to the bracing.
Minor remedial works to the apron in front of the abutments.
The existing bridge deck expansion joints are to be replaced, partially resurface the carriageway and resurface the footways.
In order to carry out the works at the pier, a temporary suspended platform will be required to provide a dry and safe working environment at the pier. Temporary scaffolding / platform over the bridge is also required for the access to the works.
The rest of this notice
The tender documents, the buyer's named contact, the award history and our AI analysis for this notice are part of Pro. Start a free trial to open the full record.
- Download the tender documents
- Contact the buyer directly
- See who won, and for how much
- Read the AI analysis of scope and risk
- Get alerts for tenders like this one
14 days free. No card required.
Guides for bidders
New to public sector tendering? These short guides explain how the process works.