Archaeology fieldwork required for the ZedPod accommodation installation.
Description
Archaeology fieldwork required for the ZedPod accommodation installation.
In accordance with the Trust's SFI's, 2 quotes were sought.
Work includes:
• Provision of Archaeological Contractor to liaise with designer team to fill in the gaps and assist in completing the WSI - the particular focus being on relation to the proposed trenching plan
• Provision of all Preliminaries throughout the works inclusive of Site Management, Welfare Facilities, Fire Points, Fencing, Security etc
• Provision of Archaeological Contractor to be in attendance during all excavation works including investigation and uncovering any features if identified
• Provision of 20T Mechanical Excavator and suitably trained CPCS Operator to carry out excavation works
• Provision of Banksman to be in attendance during all Excavation works due to proximity of existing utilities
• Temporary stockpiling of excavated arisings including heaping up to ensure the site is kept clean and tidy
• Upon completion of Archaeological inspections, all excavations are to be backfilled with the as-dug excavated arisings - all excavations are to be backfilled in engineered, compacted layers in accordance with Series 600 Highways Table
The rest of this notice
The tender documents, the buyer's named contact and the award history for this notice are free. Create an account to open the full record.
- Download the tender documents
- Contact the buyer directly
- See who won, and for how much
- Get alerts for tenders like this one
Free — no card, no trial clock.
Guides for bidders
New to public sector tendering? These short guides explain how the process works.