Back to search

DfI TRAM Permanent Cold-lay Surfacing Material (PCSM)

DfI Transport and Road Asset Management (TRAM)

Complete
Find a Tender

Published

27 Feb 2026

Notice live

Description

Permanent Cold-lay Surfacing Material (PCSM) The requirement has been divided into the following 2 lots: Lot 1 - PCSM product for use on the network.

Unlock Full Contract Details

Access full descriptions, documents, award details, and AI analysis

  • Full contract descriptions
  • Downloadable documents
  • Award and supplier details
  • AI-powered analysis
Start Free Trial

14-day free trial. No credit card required.