Back to search
DfI TRAM Permanent Cold-lay Surfacing Material (PCSM)
DfI Transport and Road Asset Management (TRAM)
Complete
Find a Tender
Published
27 Feb 2026
Notice live
Description
Permanent Cold-lay Surfacing Material (PCSM) The requirement has been divided into the following 2 lots: Lot 1 - PCSM product for use on the network.
Unlock Full Contract Details
Access full descriptions, documents, award details, and AI analysis
- Full contract descriptions
- Downloadable documents
- Award and supplier details
- AI-powered analysis
14-day free trial. No credit card required.