Terrazzo Flooring Replacement Design Services
Description
This overall scheme will deliver a full replacement at Newcastle, York, Darlington (and subject to funding Doncaster) railway stations swapping the current Terrazzo tiles with suitable alternative, the preferred solution must deliver acceptable PTV values (slip resistance), must be easy to clean and maintain, must be in keeping with the historic nature of the buildings and must not be vulnerable to sweating or other climate related phenomenon. In addition, the scheme will also look at delivering a number of other minor improvements in parallel, such as additional duct routes, supply points and improved wayfinding. These items are not core scope and will be discussed during the next stage prior to completion of final design.
This Contract needs to deliver levels of design detailed enough to progress the various consents along with constructability advice robust enough to provide better cost assurance and information as to engage the various stakeholders.
1. Design:
2. Surveys:
3. Constructability Report & Budget:
4. Management & meeting attendance:
5. Consents:
6. General Advice & Design Services:
Further information is found within the ITT Document pack.
The rest of this notice
The tender documents, the buyer's named contact, the award history and our AI analysis for this notice are part of Pro. Start a free trial to open the full record.
- Download the tender documents
- Contact the buyer directly
- See who won, and for how much
- Read the AI analysis of scope and risk
- Get alerts for tenders like this one
14 days free. No card required.
Guides for bidders
New to public sector tendering? These short guides explain how the process works.