Well-Adapted UK floods workstream
Description
Aims and Objectives
The CCC require an update of the flood risk and adaptation analysis carried out in CCRA3. We require a supplier to carry out quantitative modelling to provide a robust and comparable evidence base to our previous assessment.
The commissioned update should be constructed in a way that it can be linked to the separate CCC commission of a vulnerability dataset, which includes a flood vulnerability index.
The commissioned analysis should:
• Update CCRA3 flood risk analysis with the most recent input data on present day risk (e.g. from the 2024 National Flood Risk Assessment NaFRA2 for England).
• Test the investment requirement to maintain present-day risk, using a range of adaptation measures within the current flood defence portfolio.
• Assess the optimum level of investment for flood risk reduction.
The rest of this notice
The tender documents, the buyer's named contact and the award history for this notice are free. Create an account to open the full record.
- Download the tender documents
- Contact the buyer directly
- See who won, and for how much
- Get alerts for tenders like this one
Free — no card, no trial clock.
Guides for bidders
New to public sector tendering? These short guides explain how the process works.